Part 3
THE PANAMA CANAL

BY COLONEL GEORGE W. GOETHALS
CHIEF ENGINEER OF THE PANAMA CANAL


Making The Isthmus Healthy

The first two and a half years of American control were given to preparation.  All energies were devoted during that time to rid the Isthmus of disease by sanitation, to recruiting and organizing a working force, and providing for it suitable houses, hotels, messes, kitchens, and an adequate food supply; to assembling the plant to do the work; to increasing the capacity of the existing railway system, and to establishing a system of civil government for the Canal Zone, which is a strip of land 10 miles wide (five miles on either side of the center of the canal), extending across the Isthmus.

The work of sanitation included clearing lands, draining and filling pools and swamps for the extermination of the mosquito, the establishment of hospitals for the care of the sick and injured, and the quarantine.  In addition, to secure and maintain better health conditions, municipal improvements were undertaken in the cities of Panama and Colon and the various settlements along the line of the canal, such as the construction of reservoirs, with mains and adjuncts, for furnishing wholesome and sufficient water, sewerage, pavements, and a system of roads.

Buildings to the number of 2,009 were constructed, including office buildings, hospitals, hotels, messes, kitchens, shops, storehouses, and living quarters.  In addition to this, 1,536 buildings out of a total of 2,200 buildings turned over by the French were remodeled and repaired for use.

Recruiting agencies were established in the United States, Europe, and the West Indies.

An Immense Department Store

The Commissary Department of the Panama Railroad Company was enlarged until it is now a great department store supplying to the employees whatever may be necessary for their comfort and convenience.  Manufacturing, cold storage, and laundry pants were established and turn out each day about 90 tons of ice, 14,000 loaves of bread, 2,400 rolls, 250 gallons of ice-cream, 1,000 pounds of roasted coffee, and 7,500 pieces of laundry.  Four to five refrigerator cars, loaded with meats, vegetables, and such fruits as can be obtained, are sent out on the night freight to distant points, and every morning a supply train of about 16 cars, of which number six to eight are refrigerator cars, leaves Cristobal at 4:30 to distribute food-stuffs and laundry to the local commissaries along the line, where the employees make their purchases and where the hotels, messes, and kitchens secure their supplies for the day.

The construction plant, consisting of steam shovels, locomotives, cars, unloaders, spreaders, track-shifters, pile-drivers, cranes, dredges, steamboats, tugs, and barges, was purchased for the most part "knocked down," and shops for their erection and repair were constructed and enlarged.  Some of the machinery was built from parts manufactured in the shops.  The distance from the home market, with attendant vexatious delays in securing parts and material and the necessity for keeping the construction plant in the most efficient condition for economical operation, made it imperative that the shops be equipped to meet every possible contingency.

The capacity of the Panama Railroad, over a large part of which the spoil from Culebra Cut must be handled, was increased by double tracing it throughout, except from Cristobal to Gatun and from Culebra to Paraiso.  Yards were enlarged and connections made to areas available for dumping grounds.

Laws were framed, and civil government was established with its necessary adjuncts of courts, police force, fire companies, customs and revenue service, post-offices, public works, and treasury.

A purchasing department was organized in the Untied States for the obtainment of supplies of all kinds and descriptions.  Upon arrival on the Isthmus, the supplies are shipped to the various subdivisions of the canal-work for which they were purchased, or they are placed in storehouses along the line for issue when required.

It was only after these various yet necessary adjuncts had been provided and the forces for their operation were organized that the principal work in hand—the building of the canal—could be pushed forward with any hope of success, and too much praise cannot be given to those who conceived and established them in a working condition.

The Department of Construction and Engineering is divided into three construction divisions.  The Atlantic Division embraces the engineering construction from deep water in the Caribbean Sea to include the Gatun locks and dam; the Central Division extends from Gatun to Pedro Miguel, and the pacific Division from Pedro Miguel to deep water in the Pacific Ocean.

Keeping The Floods Out Of Culebra Cut

As already noted, the Americans continued the work in progress by the French in the cut through the continental divide, commonly known as the Culebra Cut, utilizing the French machinery until it could be replaced by more modern appliances.  This is the most formidable part of the enterprise on account of the magnitude of the cutting, and also because of the difficulties attending it, due to the excessive rainfall and to the varying character of the materials encountered.

The efficient and economical working of the plant requires that provisions be made for the disposition of the large quantities of water that result from the rains.  Whatever water is not carried off by the streams enters the cut, either through direct fall over the excavated area or by seepage into it.   Proper drainage of the cut is therefore an ever existing problem, and two distinct phases are presented, viz:

1.  To keep out the water of the surrounding country,

2.  To rid the excavated area of the water that collects in it.

A system of diversion channels accomplishes the first, and gravity drains and pumps solve the second.  The canal line follows the Obispo River, which drains the area from the divide to the Chagres River.  It has four principal tributaries, two from the east, the Masambi and the Sardinilla, and two from the west, the Mandinga and the Comacho.  These are cared for by two diversion channels.

On the east side of the cut the Obispo diversion has been constructed almost parallel to the canal and carried through a depression in the hills so as to discharge into the Chagres about one mile above the point at which the canal line crosses the river.

To the west of the cut the Comacho diversion carries the waters from Culebra to the Chagres River through the old channel of the Obisbo River.   Through a hill between Haut Obispo and Bas Obispo, which sharply deflects the river, the French has build a tunnel for diverting the flood waters, and this forms a part of the new diversion.

The canal follows the Rio Grande on the southern slope of the divide, and its waters are cared for by a diversion channel constructed by the French.  They also constructed a dam across the valley, impounding the waters, and the resulting reservoir supplies the settlements from Culebra to and including Panama.   During the wet season the diversion channel carries the overflow from the reservoir.

Part 1
Part 2
Part 4


From: The Panama Canal by Colonel George W. Goethals
An address to the National Geographic Society, February 10, 1911

CZBrats
May 13, 2001